Industry, CA
Storm damage roofing in Industry
Photograph everything before anybody touches the roof. A record made on the day is worth more than any description afterwards.
Describe the storm damage job
Three questions, then the address. Up to three Industry contractors who do this work.
You are on the list.
No provider in Industry is taking requests through this service yet. We are lining them up, and yours is kept until one can.
- Nobody gets your details yet. Your request stays with us and is not passed to any company.
- One email when someone can help. When a provider covering your area can take it on, we email you once and ask whether you want that company, by name, to contact you.
- Deleted after 90 days. If nobody can take it on, or you do not say yes, your contact details are deleted 90 days after your request.
- You decide, or you do not. There is nothing to cancel and nothing to pay us.
Nobody will call you about this request unless you say yes to a company by name.
Before you let anybody on the roof
The things worth pinning down on a storm damage job. A contractor who has not raised them has not looked properly.
- A written scope of the work, line by line
- Photographs of the damage before any work happens
- What the emergency tarp costs, separate from the repair
- Whether the contractor is licensed and insured in this state
- A local address you could actually drive to
Do not sign anything on the doorstep. Read any contract twice before you sign it; most home improvement contracts in California can be cancelled within three business days.
A local contractor who inspects and documents properly is more use to you than a fast one who is already on the roof.
Keep every receipt, including the tarp and the emergency call-out. They are part of the record of what happened and what it cost.
Locally
The second problem is the marine layer keeping the north slope damp. Nothing dramatic happens. A slope stays damp most mornings for thirty years, and eventually that is enough.
About storm damage here
I have solar panels. What happens to them?
They come off and go back on, and that is a separate cost, often handled by the solar installer rather than the roofer. If the roof is near the end of its life, do the roof first — removing and refitting panels twice is money wasted.
What if the decking is rotten underneath?
Expect a few sheets on most older roofs. Get the per-sheet rate in the contract. Open-ended decking charges are where a fixed price stops being fixed.
How much deposit is normal?
Ten to thirty per cent is ordinary, and is often used to order material. A demand for full payment up front is a reason to walk away.
Do I have to hire anyone?
Not at all. Plenty of people use this to find out what a job costs and then do nothing for a year. That is a perfectly reasonable outcome.
Start with a free estimate
Free, no obligation, and your details go to no company until you say yes.
