Industry Roofing CollectiveGet matched with vetted Industry roofers in minutes.(626) 990-2809Price my roof

Industry prices

What a metal roof costs in Industry

Metal costs roughly double asphalt and lasts roughly three times as long. Whether that is a good trade depends entirely on how long you intend to stay.

Or call (626) 990-2809

Get tile roof quotes

No cost to you. Contractors pay us, you do not.

Or call (626) 990-2809

No cost · No pressure

Get tile roof quotes

No cost to you. Contractors pay us, you do not.

Step 1 of 6

What best describes your home?

Different buildings need different crews, so this is the first thing a roofer asks.

Free, fast, and no obligation to hire anyone.

Architectural asphalt shingle$12,500 – $32,500About $625 – $950 a square. Rated life 25 to 30 years.
Standing-seam metal$28,000 – $88,500About $1,400 – $2,600 a square. Rated life 40 to 70 years.

These are estimated ranges, not quotes. Compiled from public installed-cost data for California and adjusted for how Industry is built. No contractor is bound by them, and nobody can price a roof they have not stood on.

Installed ranges for a 27-square roof in Industry, CA. One square = 100 square feet.
CoveringPer squareTypical whole roofExpected life
Architectural asphalt shingleThe default choice on most American homes, and usually the right one.$625 – $950$12,500 – $32,50025 to 30 years
Standing-seam metalThe long game. Costs double up front and outlives two shingle roofs.$1,400 – $2,600$28,000 – $88,50040 to 70 years

What moves the price

  • Where you land in the season; crews discount when the phone is quiet
  • The number of penetrations: chimneys, skylights, vents, solar mounts
  • Pitch — anything over about 7:12 needs staging and slows a crew down
  • Whether the valleys, drip edge and step flashing are being replaced or reused
  • Ventilation work, if the old roof was cooking itself from underneath

Locally

Dry offshore wind lifts material that damp coastal air had been holding down. Most wind losses here happen on a handful of nights a year.

Ask any contractor quoting metal to show you a standing-seam job they finished several years ago. The edges will tell you what you need to know.

These are estimates, not quotes. They are compiled from national installed ranges adjusted for California costs and for how Industry is built. No contractor is bound by them.

Questions about price

Why three quotes and not one?

Because one price tells you nothing. Three tells you where the middle is, and the outliers are informative in both directions — the very cheapest is usually leaving something out, and the most expensive should be able to say what you are getting for it.

What warranty should I expect?

Ask for both in writing: the material warranty from the manufacturer and the workmanship warranty from the contractor. The second one is the one that matters in year three, and it is only as good as the company behind it.

Should I take the cheapest quote?

Only if it is the same roof. Most large gaps between quotes are scope gaps. Ask the cheapest contractor which of the other quotes items they have left out, and why.

Start with a free estimate

It is free, and nothing obliges you to hire anyone.

(626) 990-2809Call nowPrice my roof